Pile Transport Rack and Supporting Cantilever for Tripod Foundations
Service Division
OVERDICK designed pile transport racks for the outboard support of up to 4 foundation piles. The two racks are supported by one cantilever for each rack. The total weight of the piles to be transported is in the range of 1,000 t, with a pile diameter ranging from 2.5 m to 2.8 m.
The structures are designed to withstand transport accelerations for a harsh North Sea environment sea state. Modifications and reinforcement design for the vessel structure were further carried out by OVERDICK.
- Client
- Hochtief Solutions2012
- Location
- North Sea
- Keywords
- offshore wind, Seafastening, Services, Structural Design
- Characteristics
-
Toal pile capacity: 4 piles – 1.000t in total
- Engineering Services
-
Concept
Detail Design - Concept
- Detail Design
- Map
-
- Other Projects in this Category
- Lifting Analysis worldwide
- BR-D Riser Guard Design South China Sea
- Sundvall Bridge Transport Baltic Sea, Germany
- Motion Analysis for Transport of new Panama C… Adriatic Sea
- Mooring Analysis worldwide
- Lifting of Barge KURT North Sea
- Multi-body Mooring Analysis worldwide
- Seafastening for Tripod Foundations North Sea
- Pile Guiding Tool Wigging Island, Australia
- Tripod Handling Tools German North Sea