The HelWin alpha topsides is designed with a watertight hull allowing it to be fabricated at a shipyard and wet towed to the field without a transport barge.
The platform has been positioned over the pre-installed foundation. After positioning the legs have been stabbed on the piles through a set of LMUs. Subsequently, the platform has been jacked up to target elevation of 22m above the sea by means of a temporary, hired, jacking system.
With its record setting topsides weight (mechanically completed and precommisioned) of over 12,000 tonnes and the bulky dimensions, the platform is beyond the lifting capabilities of any offshore crane available.
The capacity of the jacking system was scaled to meet the lifting requirements and thus allowed installation of the complete topsides in one operation eliminating the need for multiple expensive offshore lifts and minimizing the requirements for offshore hook-up and commissioning.
This is the first of a series of 4 HVDC large platforms to be installed which have been designed by OVERDICK.
- Client
- Siemens AG2013
- Location
- German North Sea
- Keywords
- Bollard Pull Analysis, FE Analysis, Fixed Platforms, Calculations, Geotechnical Analyses, Hydrostatics, In-place analyses, Integrated design solutions, MOAB, Motion Analysis, offshore wind, platform, Seafastening, Services, Structural Design
- Characteristics
-
Topsides weight: 12.000 t
J Tubes: 8
LAT: 23 m
POB: 24
Power: 576 Megawatts
- Engineering Services
-
Concept Design
Basic Engineering Jacket und Topside
Detail Design AFC of Topsides
Foundation Design
Installation Engineering
Transport & Installation Design
Marine Analysis for Tow and Installation
Structural Analysis
Structural Design
Structural Verification for Transport & Installation - Concept Design
- Basic Engineering Jacket und Topside
- Detail Design AFC of Topsides
- Foundation Design
- Installation Engineering
- Transport & Installation Design
- Marine Analysis for Tow and Installation
- Structural Analysis
- Structural Design
- Structural Verification for Transport & Installation
- Map
-
- Other Projects in this Category
- Borkum West II - Substation Platform German North Sea
- HVDC Dolwin gamma German North Sea
- MOAB® Borwin beta German North Sea
- Heavy Lift Jack-Up Vessel Innovation mobile
- Jack-Up Barge THOR mobile
- MOAB® AC Substation for GLOBAL TE… German North Sea
- MOAB® AC Substation for VEJA MATE… German North Sea
- HVDC Sylwin alpha German North Sea