Welland Platform Removal
Marine Operations and Decommissioning
The Welland platform has been removed from the North Sea by two heavy offshore heavy lifts in the winter season. Detailed operation planning and marine engineering has been conducted by Overdick for the platform decommissioning.
- Client
- Perenco2011
- Location
- British North Sea
- Keywords
- Hydrostatics, offshore oil and gas, platform, platform removals
- Engineering Services
-
Abandonment and Removal Engineering
Grillage and Sea-Fastening for Transport of Topside
Heavy Lift Analysis and Design
HSE Procedures
Marine Analysis for Tow and Offshore Lifts
MetOcean Criteria Definition
Structural Verification for Removal Operation
Topside Cutting Planning - Abandonment and Removal Engineering
- Grillage and Sea-Fastening for Transport of Topside
- Heavy Lift Analysis and Design
- HSE Procedures
- Marine Analysis for Tow and Offshore Lifts
- MetOcean Criteria Definition
- Structural Verification for Removal Operation
- Topside Cutting Planning
- Map
-
- Other Projects in this Category
- BR-E Vent Tower Malaysia
- Schwedeneck See - Gravity base platform Baltic Sea, Germany
- Lekas Northwest of Melaka City, Melaka, Malaysia
- RWE Dea Mittelplate A – Transport and Insta… German North Sea
- RWE Dea Mittelplate A – New Living Quarters German North Sea
- RWE Dea Mittelplate A pipeline German North Sea
- BAL HAF – Yemen Gulf of Aden
- BR-E Linking Bridges Malaysia
- MANSLAGT Z1 Platform Removal German North Sea