Overdick

Offshore Engineers
Naval Architects

Hamburg · Kuala Lumpur

Germany
+49 (40) 32 57 56 0
Malaysia
+60 (3) 62 06 00 00
Contact
 

Tractebel Overdick GmbH » Projects » Marine Operations and Decommissioning » Welland Platform Removal

Album PreviewSlideshow
Print Project

Welland Platform Removal

Marine Operations and Decommissioning
  • OVERDICK
  • OVERDICK
  • OVERDICK
  • OVERDICK

The Welland platform has been removed from the North Sea by two heavy offshore heavy lifts in the winter season. Detailed operation planning and marine engineering has been conducted by Overdick for the platform decommissioning.

Client
Perenco2011
Location
British North Sea
Keywords
Hydrostatics, offshore oil and gas, platform, platform removals
Characteristics

Titel: Wert

Engineering Services

Abandonment and Removal Engineering
Grillage and Sea-Fastening for Transport of Topside
Heavy Lift Analysis and Design
HSE Procedures
Marine Analysis for Tow and Offshore Lifts
MetOcean Criteria Definition
Structural Verification for Removal Operation
Topside Cutting Planning

  • Abandonment and Removal Engineering
  • Grillage and Sea-Fastening for Transport of Topside
  • Heavy Lift Analysis and Design
  • HSE Procedures
  • Marine Analysis for Tow and Offshore Lifts
  • MetOcean Criteria Definition
  • Structural Verification for Removal Operation
  • Topside Cutting Planning