MANSLAGT Z1 Platform Removal
Marine Operations and Decommissioning
The MANSLAGT Z1 Platform has been successfully removed from estuary mouth of the river Ems. Within the second project stage the topsides and the jacket have been decommissioned in two steps. The lifting, transport on the hook to shore and set-down on the quay of disposal yard have been performed by sheer-leg Barge “MATADOR 3”. Structural, in-place and rigging analyses for the platform as well as hydrostatic and mooring calculations for the crane barge have been conducted by Overdick.
The Manslagt Gas Production Platform was built in 1993. After platform shut down in 2009 the platform removal was decided in 2012.
The location of the platform in ecological protective area required special solutions for environmental protection.
- Client
- Colcrete-von Essen2013
- Location
- German North Sea
- Keywords
- Decomissioning, Heavy lift engineering, Hydrostatics, In-place analyses, Lift-out, Motion Analysis, offshore oil and gas, platform, platform removals, Removal
- Characteristics
-
LAT: 11 m
Jacket Weight: 400 t
Topsides Weight: 1900 t
- Engineering Services
-
Abandonment and Removal Engineering
Heavy Lift Analysis and Design
Removal Concept
Structural Verification for Removal Operation - Abandonment and Removal Engineering
- Heavy Lift Analysis and Design
- Removal Concept
- Structural Verification for Removal Operation
- Map
-
- Other Projects in this Category
- BR-E Linking Bridges Malaysia
- Welland Platform Removal British North Sea
- RWE Dea Mittelplate A pipeline German North Sea
- RWE Dea Mittelplate A – New Living Quarters German North Sea
- RWE Dea Mittelplate A – Transport and Insta… German North Sea
- Lekas Northwest of Melaka City, Melaka, Malaysia
- Schwedeneck See - Gravity base platform Baltic Sea, Germany
- BR-E Vent Tower Malaysia
- BAL HAF – Yemen Gulf of Aden