Overdick

Offshore Engineers
Naval Architects

Hamburg · Kuala Lumpur

Germany
+49 (40) 32 57 56 0
Malaysia
+60 (3) 62 06 00 00
Contact
 

www.overdick.com

Welland Platform Removal

Album Preview

Welland Platform Removal

Marine Operations and Decommissioning

The Welland platform has been removed from the North Sea by two heavy offshore heavy lifts in the winter season. Detailed operation planning and marine engineering has been conducted by Overdick for the platform decommissioning.

Location: British North Sea



Project Details

Client
Perenco, 2011
Keywords
Hydrostatics, offshore oil and gas, platform, platform removals
Characteristics

Titel: Wert

Engineering Services

Abandonment and Removal Engineering
Grillage and Sea-Fastening for Transport of Topside
Heavy Lift Analysis and Design
HSE Procedures
Marine Analysis for Tow and Offshore Lifts
MetOcean Criteria Definition
Structural Verification for Removal Operation
Topside Cutting Planning

Image #1 of 5 ©2014 Overdick

Album Preview

Image #2 of 5 ©2014 Overdick

Album Preview

Image #3 of 5 ©2014 Overdick

Album Preview

Image #4 of 5 ©2014 Overdick

Album Preview

Image #5 of 5 ©2014 Overdick

Album Preview