Welland Platform Removal
Marine Operations and Decommissioning
The Welland platform has been removed from the North Sea by two heavy offshore heavy lifts in the winter season. Detailed operation planning and marine engineering has been conducted by Overdick for the platform decommissioning.
Location: British North Sea
Project Details
- Client
- Perenco, 2011
- Keywords
- Hydrostatics, offshore oil and gas, platform, platform removals
- Characteristics
-
Titel: Wert
- Engineering Services
-
Abandonment and Removal Engineering
Grillage and Sea-Fastening for Transport of Topside
Heavy Lift Analysis and Design
HSE Procedures
Marine Analysis for Tow and Offshore Lifts
MetOcean Criteria Definition
Structural Verification for Removal Operation
Topside Cutting Planning