MOAB® South Angsi SA-A
Offshore Oil and Gas
The South Angsi A platform was a very successfull fast track field development managed by Talisman Malaysia in record time. The platform is conceived with a separate, pre-installed substructure (Jacket) planned to be early on the field in order to pre-construct the producing and injecting wells. In the mean-time the MOAB® topsides was fabricated, pre-commissioned and installed. With all the wells already completed, after a short hook up and commissioning time, the project was break even 3 months after first oil.
Location: Malaysia
Project Details
- Client
- Talisman Energy Malaysia, 2005
- Keywords
- FE Analysis, Fixed Platforms, Geotechnical Analyses, Heavy lift engineering, Hydrostatics, In-place analyses, Load-out, MOAB, Motion Analysis, offshore oil and gas, platform, production platform, Structural Design
- Characteristics
-
LAT: 70 m
Payload: 2850 t
Conductors: 9
- Engineering Services
-
Concept Design
Concept
Detail Design
Detail Engineering
Heavy Lift Analysis and Design
Installation Engineering
Load out and Float-Over Engineering
Transport & Installation Design
Transport & Installation Engineering
Marine Analysis for Tow and Installation
Operation Manuals
Platform Concept
Project Management
Structural Analysis
Structural Design
Image #1 of 4 ©2014 Overdick

Image #2 of 4 ©2014 Overdick

Image #3 of 4 ©2014 Overdick

Image #4 of 4 ©2014 Overdick