Bunga Raya - E Gas treatment Platform
Offshore Oil and Gas
Overdick designed Bunga Raya E Gas treatment. Having a transport weight of 12,000 t it is is one of the largest platform in Malaysia’s waters. Overdick was contracted for the structural, load-out and installation engineering.
The Bunga Raya Field is composed by a complex of platforms:
- BR-A Central Processing Platform
- BR-B Wellhead Platform
- BR-C Wellhead Platform
- BR-D Processing Extension
- BR-E Gas Treatment
- BR-F Vent and Flare Tower
The BR-D, BR-E, BR-F and the two interconnecting bridges have been designed by OVERDICK
Location: Malaysia
Project Details
- Client
- Talisman Energy Malaysia, 2006
- Keywords
- FE Analysis, Fixed Platforms, Float over, Geotechnical Analyses, Hydrostatics, In-place analyses, Jacket, Launches, Load-out, offshore oil and gas, platform, production platform, Seatransports, Services, Structural Design
- Characteristics
-
LAT: 56m
Topsides Loadout Weight: 12.000t
Jacket: 8 piled legs
- Engineering Services
-
Basic Engineering
Concept Design
Detail Analysis of Jacket
Detail Design AFC of Topsides
Detail Engineering of the Platform and the Link Bridge
Installation Engineering
Load out and Float-Over Engineering
Load Support Frame
Site Support for Completion, Load out and Sail-Away Activities
Structural Analysis
Structural Design
Structural Optimization Study
Structural Verification for Transport & Installation