Overdick

Offshore Engineers
Naval Architects

Hamburg · Kuala Lumpur

Germany
+49 (40) 32 57 56 0
Malaysia
+60 (3) 62 06 00 00
Contact
 

www.overdick.com

BR-D Riser Guard Design

Album Preview

BR-D Riser Guard Design

Service Division

The BR-D MOAB platform is part of the Bunga Raya Field Development the South China Sea. Based on environmental studies a riser guard was needed to protect the live risers from ship collision.
OVERDICK designed the riser guard and performed the engineering for seafastening, as well as transportation and installation.

Location: South China Sea



Project Details

Client
Talisman Energy Malaysia, 2012
Keywords
Hydrostatics, Seafastening, Services
Characteristics

Titel: Wert

Engineering Services

Marine Analysis for Tow and Installation
MetOcean Criteria Definition
Procedures
Seafastening

Image #1 of 11 ©2014 Overdick

Album Preview

Image #2 of 11 ©2014 Overdick

Album Preview

Image #3 of 11 ©2014 Overdick

Album Preview

Image #4 of 11 ©2014 Overdick

Album Preview

Image #5 of 11 ©2014 Overdick

Album Preview

Image #6 of 11 ©2014 Overdick

Album Preview

Image #7 of 11 ©2014 Overdick

Album Preview

Image #8 of 11 ©2014 Overdick

Album Preview

Image #9 of 11 ©2014 Overdick

Album Preview

Image #10 of 11 ©2014 Overdick

Album Preview

Image #11 of 11 ©2014 Overdick

Album Preview