Lekas

Marine Operations and Decommissioning

Petronas Gas Bhd (Petronas) built a marine jetty as part of their LNG regasification facilities at the nearshore Sungai Udang site in Melaka. The jetty is an offshore LNG island with storage and unloading berths situated in northwest of Melaka city.
The jetty consists of 22 jackets, of which 12 are for mooring dolphins and 10 are for breasting dolphins. In addition, the LEKAS project includes three piled loading platforms and one for utility platform.
Overdick represented by Overdick (Malaysia) Sdn Bhd has performed the engineering works for the transportations and heavy lifts for this project.

Location: Northwest of Melaka City, Melaka, Malaysia



Project Details

Client
Petronas, 2011
Keywords
Bollard Pull Analysis, Hydrostatics, Mooring Analysis, offshore oil and gas, platform, Seafastening, Seatransports, Services
Characteristics

Titel: Wert

Engineering Services

Bollard Pull Calculation
Grillage and Sea-Fastening
Heavy Lift Analysis and Design
Load out and Float-Over Engineering
Marine Analysis for Tow and Installation
MetOcean Criteria Definition
Mooring Analysis
Seafastening
Structural Verification for Transport & Installation
Transport & Installation Detailed Procedures
Transport & Installation Engineering
Upending and Load-Out