MANSLAGT Z1 Platform Removal

Album Preview

MANSLAGT Z1 Platform Removal

Marine Operations and Decommissioning

The MANSLAGT Z1 Platform has been successfully removed from estuary mouth of the river Ems. Within the second project stage the topsides and the jacket have been decommissioned in two steps. The lifting, transport on the hook to shore and set-down on the quay of disposal yard have been performed by sheer-leg Barge “MATADOR 3”. Structural, in-place and rigging analyses for the platform as well as hydrostatic and mooring calculations for the crane barge have been conducted by Overdick.

The Manslagt Gas Production Platform was built in 1993. After platform shut down in 2009 the platform removal was decided in 2012.
The location of the platform in ecological protective area required special solutions for environmental protection.

Location: German North Sea



Project Details

Client
Colcrete-von Essen, 2013
Keywords
Decomissioning, Heavy lift engineering, Hydrostatics, In-place analyses, Lift-out, Motion Analysis, offshore oil and gas, platform, platform removals, Removal
Characteristics

LAT: 11 m
Jacket Weight: 400 t
Topsides Weight: 1900 t

Engineering Services

Abandonment and Removal Engineering
Heavy Lift Analysis and Design
Removal Concept
Structural Verification for Removal Operation

Image #1 of 10 ©2014 Overdick

Album Preview

Image #2 of 10 ©2014 Overdick

Album Preview

Image #3 of 10 ©2014 Overdick

Album Preview

Image #4 of 10 ©2014 Overdick

Album Preview

Image #5 of 10 ©2014 Overdick

Album Preview

Image #6 of 10 ©2014 Overdick

Album Preview

Image #7 of 10 ©2014 Overdick

Album Preview

Image #8 of 10 ©2014 Overdick

Album Preview

Image #9 of 10 ©2014 Overdick

Album Preview

Image #10 of 10 ©2014 Overdick

Album Preview